{"id":35,"date":"2026-09-30T10:01:41","date_gmt":"2026-09-30T10:01:41","guid":{"rendered":"https:\/\/kulmisltd.com\/?page_id=35"},"modified":"2026-09-30T10:01:41","modified_gmt":"2026-09-30T10:01:41","slug":"construction-and-engineering","status":"publish","type":"page","link":"https:\/\/kulmisltd.com\/?page_id=35","title":{"rendered":"Construction and Engineering"},"content":{"rendered":"\n<p class=\"eyebrow wp-block-paragraph\">Practical engineering. Accountable construction.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Construction and Engineering<\/h2>\n\n\n<p class=\"wp-block-paragraph\">KULMIS delivers construction and engineering services for buildings, water infrastructure and development projects. Our approach brings together planning, materials, site coordination and construction activities, with safety, quality and accountability guiding the work.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Areas of experience<\/h2>\n\n\n<ul class=\"wp-block-list\">\n<li>Building construction and development works.<\/li>\n\n\n<li>Foundation excavation, reinforcement and formwork.<\/li>\n\n\n<li>Elevated water towers and storage infrastructure.<\/li>\n\n\n<li>Irrigation-related civil works and solar pumping components.<\/li>\n\n\n<li>Procurement and delivery of project materials.<\/li>\n\n<\/ul>\n\n\n<h2 class=\"wp-block-heading\">Selected construction work<\/h2>\n\n\n<p class=\"wp-block-paragraph\"><strong>Revenue Department premises, Kismayo \u2014 2023:<\/strong> Construction and development works for the Jubaland Ministry of Finance.<\/p>\n\n\n<p class=\"wp-block-paragraph\"><strong>Halgan IDP Camp water tower \u2014 June 2026:<\/strong> The project photographs document foundation excavation on 5 June and the scaffolded tower structure on 16 June. These are progress records, not a final completion certificate.<\/p>\n\n\n<p class=\"wp-block-paragraph\"><strong>MARINEPLEX commercial building \u2014 August 2026:<\/strong> Foundation works, formwork and reinforcement, with construction documented as ongoing in the August records.<\/p>\n\n\n<div class=\"wp-block-group kulmis-gallery is-layout-flow wp-block-group-is-layout-flow\">\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/kulmisltd.com\/wp-content\/themes\/kulmis-ltd\/assets\/projects-01.jpg\" alt=\"Halgan IDP Camp water tower \u2014 foundation excavation, 5 June 2026.\" loading=\"lazy\"\/><figcaption class=\"wp-element-caption\">Halgan IDP Camp water tower \u2014 foundation excavation, 5 June 2026.<\/figcaption><\/figure>\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/kulmisltd.com\/wp-content\/themes\/kulmis-ltd\/assets\/projects-02.jpg\" alt=\"Halgan IDP Camp water tower \u2014 scaffolded superstructure, 16 June 2026.\" loading=\"lazy\"\/><figcaption class=\"wp-element-caption\">Halgan IDP Camp water tower \u2014 scaffolded superstructure, 16 June 2026.<\/figcaption><\/figure>\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/kulmisltd.com\/wp-content\/themes\/kulmis-ltd\/assets\/projects-05.jpg\" alt=\"MARINEPLEX \u2014 foundation works recorded in August 2026.\" loading=\"lazy\"\/><figcaption class=\"wp-element-caption\">MARINEPLEX \u2014 foundation works recorded in August 2026.<\/figcaption><\/figure>\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/kulmisltd.com\/wp-content\/themes\/kulmis-ltd\/assets\/projects-06.jpg\" alt=\"MARINEPLEX \u2014 formwork and reinforcement, August 2026.\" loading=\"lazy\"\/><figcaption class=\"wp-element-caption\">MARINEPLEX \u2014 formwork and reinforcement, August 2026.<\/figcaption><\/figure>\n\n<\/div>\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/kulmisltd.com\/?page_id=34\">View project records<\/a><\/p>\n\n\n<h2 class=\"wp-block-heading\">Discuss your project<\/h2>\n\n\n<p class=\"wp-block-paragraph\">Tell us the service you need, your location, scope and preferred timeline. We will discuss a practical approach matched to your requirements.<\/p>\n\n\n<p class=\"wp-block-paragraph\"><a href=\"\/#contact\">Business enquiries<\/a><\/p>\n\n","protected":false},"excerpt":{"rendered":"<p>Practical engineering. Accountable construction. Construction and Engineering KULMIS delivers construction and engineering services for buildings, water infrastructure and development projects. Our approach brings together planning, materials, site coordination and construction activities, with safety, quality and accountability guiding the work. Areas of experience Selected construction work Revenue Department premises, Kismayo \u2014 2023: Construction and development works [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-35","page","type-page","status-publish","hentry"],"brizy_media":[],"_links":{"self":[{"href":"https:\/\/kulmisltd.com\/index.php?rest_route=\/wp\/v2\/pages\/35","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/kulmisltd.com\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/kulmisltd.com\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/kulmisltd.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/kulmisltd.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=35"}],"version-history":[{"count":0,"href":"https:\/\/kulmisltd.com\/index.php?rest_route=\/wp\/v2\/pages\/35\/revisions"}],"wp:attachment":[{"href":"https:\/\/kulmisltd.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=35"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}