{"id":34,"date":"2026-09-30T10:01:41","date_gmt":"2026-09-30T10:01:41","guid":{"rendered":"https:\/\/kulmisltd.com\/?page_id=34"},"modified":"2026-09-30T10:01:41","modified_gmt":"2026-09-30T10:01:41","slug":"records-since-2020","status":"publish","type":"page","link":"https:\/\/kulmisltd.com\/?page_id=34","title":{"rendered":"Records Since 2020"},"content":{"rendered":"\n<p class=\"eyebrow wp-block-paragraph\">PROJECTS, SUPPLY ASSIGNMENTS AND DEVELOPMENT WORK<\/p>\n\n\n<h2 class=\"wp-block-heading\">Our Record of Work<\/h2>\n\n\n<p class=\"wp-block-paragraph\">KULMIS Logistics and Construction Company was founded in 2021. The selected company assignments presented here begin in 2022. Earlier hospitality experience belongs to the leadership\u2019s work before KULMIS was founded.<\/p>\n\n\n<h2 class=\"wp-block-heading\">2022\u20132024 | Food and Ration Supply<\/h2>\n\n\n<p class=\"wp-block-paragraph\"><strong>Client:<\/strong> Ministry of Finance, Jubaland State.<br><strong>Assignment:<\/strong> Food\/ration supply and logistics for the Jubaland Security Forces.<br><strong>Period:<\/strong> 2022\u20132024.<\/p>\n\n\n<h2 class=\"wp-block-heading\">2022\u20132024 | Fuel Supply and Transportation<\/h2>\n\n\n<p class=\"wp-block-paragraph\"><strong>Client:<\/strong> Ministry of Finance, Jubaland State.<br><strong>Assignment:<\/strong> Fuel supply, transportation and logistics for the Jubaland Security Forces.<br><strong>Period:<\/strong> 2022\u20132024.<\/p>\n\n\n<h2 class=\"wp-block-heading\">2023 | Revenue Department Premises<\/h2>\n\n\n<p class=\"wp-block-paragraph\"><strong>Client:<\/strong> Jubaland Ministry of Finance.<br><strong>Location:<\/strong> Kismayo.<br><strong>Assignment:<\/strong> Construction and development of Revenue Department premises.<br><strong>Year:<\/strong> 2023.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Bula Bartire Irrigation Project<\/h2>\n\n\n<p class=\"wp-block-paragraph\"><strong>Location:<\/strong> Bula Bartire, Kismayo District, Jubaland State.<br><strong>Scope:<\/strong> Water tower, solar-powered pumping component and related materials supply.<br><strong>Programme context:<\/strong> Rehabilitation initiative supported through Jubaland\u2019s Ministry of Finance with World Bank funding, as described in the company record.<\/p>\n\n\n<p class=\"wp-block-paragraph\">The photo record covers excavation, roof-truss assembly, the finished elevated tower, solar installation and HDPE pipeline delivery. Activity dates are being reconciled; photographs should not be read as evidence of a single completion date for the entire programme.<\/p>\n\n\n<div class=\"wp-block-group kulmis-gallery is-layout-flow wp-block-group-is-layout-flow\">\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/kulmisltd.com\/wp-content\/themes\/kulmis-ltd\/assets\/projects-03.jpg\" alt=\"Bula Bartire \u2014 tank excavation and base works.\" loading=\"lazy\"\/><figcaption class=\"wp-element-caption\">Bula Bartire \u2014 tank excavation and base works.<\/figcaption><\/figure>\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/kulmisltd.com\/wp-content\/themes\/kulmis-ltd\/assets\/projects-09.jpg\" alt=\"Bula Bartire \u2014 roof-truss assembly.\" loading=\"lazy\"\/><figcaption class=\"wp-element-caption\">Bula Bartire \u2014 roof-truss assembly.<\/figcaption><\/figure>\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/kulmisltd.com\/wp-content\/themes\/kulmis-ltd\/assets\/projects-04.jpg\" alt=\"Bula Bartire \u2014 finished elevated water tower.\" loading=\"lazy\"\/><figcaption class=\"wp-element-caption\">Bula Bartire \u2014 finished elevated water tower.<\/figcaption><\/figure>\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/kulmisltd.com\/wp-content\/themes\/kulmis-ltd\/assets\/projects-07.jpg\" alt=\"Bula Bartire \u2014 solar-powered pumping installation.\" loading=\"lazy\"\/><figcaption class=\"wp-element-caption\">Bula Bartire \u2014 solar-powered pumping installation.<\/figcaption><\/figure>\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/kulmisltd.com\/wp-content\/themes\/kulmis-ltd\/assets\/projects-08.jpg\" alt=\"Bula Bartire \u2014 HDPE pipeline materials delivery.\" loading=\"lazy\"\/><figcaption class=\"wp-element-caption\">Bula Bartire \u2014 HDPE pipeline materials delivery.<\/figcaption><\/figure>\n\n<\/div>\n\n\n<h2 class=\"wp-block-heading\">June 2026 | Halgan IDP Camp Water Tower<\/h2>\n\n\n<p class=\"wp-block-paragraph\"><strong>Location:<\/strong> Halgan IDP Camp.<br><strong>Recorded milestones:<\/strong> Foundation excavation on 5 June 2026; scaffolded superstructure on 16 June 2026.<br><strong>Status shown:<\/strong> Construction in progress at the time of the photographs.<\/p>\n\n\n<div class=\"wp-block-group kulmis-gallery is-layout-flow wp-block-group-is-layout-flow\">\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/kulmisltd.com\/wp-content\/themes\/kulmis-ltd\/assets\/projects-01.jpg\" alt=\"Halgan IDP Camp \u2014 foundation excavation, 5 June 2026.\" loading=\"lazy\"\/><figcaption class=\"wp-element-caption\">Halgan IDP Camp \u2014 foundation excavation, 5 June 2026.<\/figcaption><\/figure>\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/kulmisltd.com\/wp-content\/themes\/kulmis-ltd\/assets\/projects-02.jpg\" alt=\"Halgan IDP Camp \u2014 superstructure, 16 June 2026.\" loading=\"lazy\"\/><figcaption class=\"wp-element-caption\">Halgan IDP Camp \u2014 superstructure, 16 June 2026.<\/figcaption><\/figure>\n\n<\/div>\n\n\n<h2 class=\"wp-block-heading\">August 2026 | MARINEPLEX Commercial Building<\/h2>\n\n\n<p class=\"wp-block-paragraph\"><strong>Recorded start:<\/strong> 5 August 2026.<br><strong>Scope shown:<\/strong> Foundation works, reinforced formwork and structural preparation.<br><strong>Status recorded:<\/strong> Ongoing as of the August 2026 records.<\/p>\n\n\n<div class=\"wp-block-group kulmis-gallery is-layout-flow wp-block-group-is-layout-flow\">\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/kulmisltd.com\/wp-content\/themes\/kulmis-ltd\/assets\/projects-05.jpg\" alt=\"MARINEPLEX \u2014 foundation works.\" loading=\"lazy\"\/><figcaption class=\"wp-element-caption\">MARINEPLEX \u2014 foundation works.<\/figcaption><\/figure>\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/kulmisltd.com\/wp-content\/themes\/kulmis-ltd\/assets\/projects-06.jpg\" alt=\"MARINEPLEX \u2014 formwork and reinforcement.\" loading=\"lazy\"\/><figcaption class=\"wp-element-caption\">MARINEPLEX \u2014 formwork and reinforcement.<\/figcaption><\/figure>\n\n<\/div>\n\n\n<h2 class=\"wp-block-heading\">Discuss your project<\/h2>\n\n\n<p class=\"wp-block-paragraph\">Tell us the service you need, your location, scope and preferred timeline. We will discuss a practical approach matched to your requirements.<\/p>\n\n\n<p class=\"wp-block-paragraph\"><a href=\"\/#contact\">Business enquiries<\/a><\/p>\n\n","protected":false},"excerpt":{"rendered":"<p>PROJECTS, SUPPLY ASSIGNMENTS AND DEVELOPMENT WORK Our Record of Work KULMIS Logistics and Construction Company was founded in 2021. The selected company assignments presented here begin in 2022. Earlier hospitality experience belongs to the leadership\u2019s work before KULMIS was founded. 2022\u20132024 | Food and Ration Supply Client: Ministry of Finance, Jubaland State.Assignment: Food\/ration supply and [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-34","page","type-page","status-publish","hentry"],"brizy_media":[],"_links":{"self":[{"href":"https:\/\/kulmisltd.com\/index.php?rest_route=\/wp\/v2\/pages\/34","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/kulmisltd.com\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/kulmisltd.com\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/kulmisltd.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/kulmisltd.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=34"}],"version-history":[{"count":0,"href":"https:\/\/kulmisltd.com\/index.php?rest_route=\/wp\/v2\/pages\/34\/revisions"}],"wp:attachment":[{"href":"https:\/\/kulmisltd.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=34"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}